Energy
Three Energy Corridor floors consolidated into one campus building
Midstream engineering firm

The brief
What the client needed
The client held three floors in two buildings on expiring leases and had signed a single campus building on Eldridge Parkway. The engineering group carried 640 linear feet of plan files, eleven large-format plotters and a sample library that had never been catalogued.
The constraint was a live project delivery in the same period, which meant one department could not be offline for more than 36 hours at any point.
How we ran it
- 01
Split the move by dependency
The engineering group moved on weekend one with its plotters and plan files. Everything else moved on weekend two, which kept the live delivery team stable through the critical fortnight.
- 02
Catalogue before crating
The sample library was inventoried and barcoded on intake so it could be shelved to a plan at destination rather than stacked and sorted later.
- 03
Plotters as a technical scope
Large-format plotters were handled as equipment, not furniture: rigged, crated, and recommissioned by the manufacturer on the Monday of each phase.
The result
Both phases opened on the scheduled Monday with no business day lost. Plan files arrived in drawer order and the sample library was shelved to a catalogued plan for the first time in the firm's history.
The surrendered floors were decommissioned in the following fortnight, with 61 percent of the furniture by weight resold or donated and a diversion report issued for the client's sustainability file.
The phasing was the whole answer. Our delivery team never stopped, and the plan room came back in order.
More projects
Other case studies

Professional services
Eleven floors of filing moved downtown over one long weekend
44,800 sq ft across eleven floors

Healthcare
Four clinics relocated between patient days without a cancelled appointment
38,600 sq ft across four sites

Laboratories and IT
A 22-rack data room and a wet lab moved across a single campus
18,900 sq ft including a 2,100 sq ft data room

Next step
Book the survey before you book the date
Freight elevator windows in downtown towers are commonly reserved four to six weeks out. The survey is what tells you whether your date is real.